AB
NICER telescope mounted on the Integrated Truss Structure of the International Space Station…
Mission typeNeutron star astrophysics
OperatorNASA / GSFC / MIT
Websitehttps://heasarc.gsfc.nasa.gov/docs/nicer/
Mission duration18 months (planned)
9 years and 25 days (in progress)
Spacecraft properties…
Launch mass372 kg (820 lb)1
Start of mission…
Launch date3 June 2017, 21:07:38 UTC2
RocketFalcon 9 Full Thrust, B1035.1
Launch siteKennedy Space Center, LC-39A
ContractorSpaceX
Orbital parameters…
Reference systemGeocentric orbit
RegimeLow Earth orbit
Perigee altitude402 km (250 mi)
Apogee altitude407 km (253 mi)
Inclination51.64°
Period92.66 minutes
Instruments…
X-ray Timing Instrument (XTI)…

NICER ﹡ SEXTANT mission patch Explorer program
…

NICER

(echo:: @ ᯤ)

Footnotes

  1. “SpaceX CRS-11 Mission Overview” (PDF). NASA. Retrieved 3 June 2017. This article incorporates text from this source, which is in the public domain. ↩

  2. Clark, Stephen (3 June 2017). “Reused Dragon cargo capsule launched on journey to space station”. Spaceflight Now. Retrieved 3 June 2017. ↩